







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Jerith Home Additions & ADU: The West Covina Owner’s Guide
If you’re searching for Jerith home additions or ADU work in West Covina, you’re likely facing a project that has stalled, a scope that’s grown past what your original contractor quoted, or a backyard unit that never got permitted properly. We install and complete Jerith-compatible home additions and ADUs throughout West Covina, with most full additions running $45,000 – $130,000 and ADU construction landing between $90,000 and $220,000. Owners usually find us when a previous contractor walked off, when the city flagged unpermitted work, or when they realized the “finished” addition leaks at the roofline where it ties into the original house.

The most common story we hear? Someone started with a handyman or a friend-of-a-friend, got walls up but no electrical signed off, and now the West Covina Building & Safety division won’t issue a certificate of occupancy. That’s where we come in: we diagnose the framing, the tie-in, the drainage slope, and the paperwork, then put a written price in front of you before we pick up a tool.
Key Takeaways:
- Typical Jerith-style home addition in West Covina: $45,000 – $130,000, depending on foundation work, roofline tie-in complexity, and finish level.
- ADU construction (detached or attached): $90,000 – $220,000, including plans, permits, utility connections, and interior finishes.
- You get a written price before any work starts, a 365-day Done Right Promise, and a named crew with photo verification before anyone arrives.
Which Jerith Models This Applies To

Jerith doesn’t manufacture home additions or ADUs as a branded kit: the name refers to Jerith’s aluminum and steel fencing line, but homeowners in West Covina frequently search “Jerith home addition” because a Jerith fence or enclosure was part of the original property package, and now the addition is failing around it. We’ve worked on dozens of West Covina homes where a Jerith aluminum fence ties into a patio cover, a garage conversion, or a backyard ADU, and the failure point is usually where the addition’s exterior wall meets the fence post line, or where the ADU’s egress window faces a Jerith fence panel that now needs adjustment after the slab settled.
Here’s the compatibility reality: if your existing Jerith fence is attached to a failing addition, the addition’s foundation movement will pull the fence line out of level. You can’t just swap a fence panel; you have to address the structural cause first. We match Jerith’s standard 6-foot and 8-foot panel widths, 2-inch square aluminum posts, and the powder-coated black and bronze finishes, so any new fence work matches what’s already there. OEM Jerith parts are fine for fence-only repairs, but for additions and ADUs that include fencing, we often spec aftermarket posts with heavier wall thickness because the San Gabriel Valley’s expansive clay soil moves more than most national averages assume.
Styles & brands we work with







Signs Your Jerith Home Addition or ADU Is Failing
- Cracking at the roofline where the addition meets the original house. This is the classic failure point. When the new foundation settles at a different rate than the 1950s or 1960s slab it’s tied to, you get horizontal cracks along the seam. In West Covina’s older neighborhoods near Eastland Center, we see this regularly on homes built before 1970.
- Doors that stick or won’t latch inside the addition. That’s not a hinge problem. It’s the floor system or wall framing racking as the foundation shifts. If two doors on opposite ends of the addition both stick, settlement is the cause.
- A Jerith fence line pulling away from the addition wall. Posts that were plumb are now leaning, and the panel gaps widen at the top. The addition’s slab edge is moving, and the fence is anchored to it.
- Water staining on the interior ceiling of the ADU near the exterior wall. Usually a failed flashing detail where the ADU roof meets the main structure, or a grade issue where water flows toward the ADU slab instead of away from it.
- Electrical outlets that trip breakers or show low voltage in the ADU. This is often undersized feeder wire from the main panel, or improperly terminated connections at the junction box. A licensed electrician needs to inspect it; we won’t guess at wiring.
If the addition involves high-voltage wiring, gas lines, or structural framing at height, leave the diagnosis to a professional. A shock or a collapsed wall is not worth the money saved on a DIY inspection, and honestly, neither is the repaired water damage that comes from a misdiagnosed roof leak.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

In West Covina, a full Jerith-adjacent home addition runs $45,000 – $130,000, and that range is driven almost entirely by three things: how much foundation work the existing slab needs, whether the roofline can tie in cleanly or needs a new structural ridge, and what finish level you choose inside. ADU construction lands at $90,000 – $220,000, with detached units at the higher end, especially if you need new utility trenching from the street or a panel upgrade. Garage conversions, a frequent West Covina project, fall between $30,000 and $80,000.
The price we give you is a written, line-item number. It includes the parts, the labor, the permit fees we pay on your behalf, the dumpster, and the final inspection. It does not include surprise change orders; if we find something in the wall that changes the scope, we tell you before we touch it, and we explain exactly what the new number is and why. Our work is covered by the 365-Day Done Right Promise: if something isn’t right within a year of completion, we fix it at no cost to you.
DIY or Call Us?
What you can safely do: document the failure. Take photos of the cracks, the sticking doors, the fence line, the water stains. Measure the crack widths with a pencil date mark so you can tell if they’re actively moving. Pull the original permits from the City of West Covina’s online portal so you know what was approved versus what was actually built. That’s all useful, and it costs you nothing but an afternoon.
What you should not do: open walls near electrical or gas lines, attempt to jack a settled slab, or reframe a roof tie-in. Those are genuinely dangerous tasks that require licensed tradespeople, and in West Covina, unpermitted structural work will come back when you sell the house. Isaac Pruett has seen more than one homeowner try to save money on a foundation repair and end up spending triple to fix the fix. Call (707) 760-7579 and we’ll give you a written estimate before any work begins. You should know what you’re getting before we ever pick up a tool.
FAQs

A properly built addition should last 50 years or more on the structural side, with roofing and siding replaced on their own normal schedules. The weak point in West Covina is the foundation: the expansive clay soil under much of the city means footings need to be deeper than code minimums in some areas, especially on older hillside lots and near the washes. If the footing is undersized, expect movement within the first three to five years.
Usually yes, if the framing is sound and the issue is isolated to foundation settling, flashing, or a poor tie-in detail. We repair what’s repairable: helical piers and plate anchors for foundation movement, new flashing and crickets for roof leaks, and re-shimming for door frames. If the structure is racking beyond what repairs can correct, we’ll show you exactly why with measurements, not opinions. Call (707) 760-7579 for an exact assessment, and the estimate is free.
A detached ADU takes four to seven months from permit approval to final inspection, and plan review at the city add roughly two to three months on top of that. Attached conversions run faster, usually three to five months of construction. The schedule we give you is the schedule we hold; if we hit a delay, we tell you when we know, not when you ask.
We stock common Jerith aluminum fence sections, post caps, and gate hardware on the truck, plus the fasteners and brackets we use for tie-ins and flashing. For addition and ADU work specifically, we order material per job from specification-grade suppliers, including brands we know hold up in West Covina’s heat and sun. We also work with KraftMaid, Cambria, and Silestone when your project includes cabinetry, countertops, or a full interior finish.
Written by Isaac Pruett, Owner, Mason Remodeling Co West Covina at Mason Remodeling Co West Covina, serving West Covina and nearby areas.


